The information the plant runs on, pointed to, not copied.One register per unit, and limits that change only with an approved MOC.

For process safety engineers and unit owners: answer each item with the document, study or barrier that holds it, or mark it not applicable with a reason. Then publish the limits operators read, mode by mode.

Limits. The version operators read. Each row carries its mode, consequence, steps and the time to act.

Propane vaporizer area
North terminal · owner Sarah Mitchell
Limits version 3 · published 14 Oct 2026 · MOC-2026-0031
VariableLimitModeClassConsequence of deviationStepsTimeBasisSourceProtection beyond
V-201 · Pressure · Upper
17.5 bar gNormalSafe operating limitOverpressure of V-201 toward the PSV-201 set pressure; rupture and propane fire if relief fails
  1. Close steam supply TV-201 by hand
  2. Confirm PI-201 falling
  3. Call the shift supervisor
10 minDS-V201 · rev DHAZOP-0007 · Node 2 · More pressureBE-0012 · In place
V-201 · Level · Upper
80 %NormalSafe operating limitLiquid carry-over into the vapour header; liquid propane reaches the users
  1. Reduce feed on FV-203
  2. Confirm LI-202 falling
  3. Stand by for LSHH-202 trip
15 minDS-V201 · rev DHAZOP-0007 · Node 2 · High levelBE-0015 · Impaired
V-201 · Temperature · LowerNo time to consequenceNo source scenario
−5 °CStart-upCritical integrity windowShell below its minimum design metal temperature; brittle fracture
  1. Stop liquid admission
  2. Warm through on vapour only
—DS-V201 · rev D——

One unit, three views of the same record. An example unit; the fields are the product’s, the values illustrative.

V-201 · Pressure · Upper
17.5 bar g · Normal · Safe operating limitOverpressure of V-201 toward the PSV-201 set pressure; rupture and propane fire if relief fails
Steps
Close steam supply TV-201 by hand · Confirm PI-201 falling · Call the shift supervisor
Time
10 min to consequence
Limits version 3 · in force since 14 Oct 2026

Where it connects

HAZOP & LOPAProcess Safety InformationManagement of Change

On the same loop: Document Manager, Barrier Management, Chemical Management and 38 more modules in one workspace.

Method note

Limits from the HAZOP, or from the design basis? Both schools are right.

Operations teams start from the scenarios. Engineering teams start from the data sheets. Neither list is complete on its own.

Leandro · Founder, UProcess

One school derives each safe operating limit from a HAZOP deviation, so the consequence and the time to act are already argued. The other starts from the design basis, the vessel data sheet or the relief case, so every number has a document behind it. A limit with neither is a guess; a limit with only one is half a case.

So each row can carry its scenario, its basis, or both, and the checks say which one is missing.

  • From the HAZOPDeviations with a parameter propose rows through a preview, with the scenario consequence as starting text.
  • From the basisThe row cites the document that sets the number, at the revision in force.
  • Both on one rowSource scenario and basis side by side, for the limits an auditor will open first.

Where Process Safety Information usually breaks

Four places the information a plant runs on goes wrong, and what the register does about each.

01

A limit for normal running, none for the mode you are in.

The CSB found a refinery’s fluid catalytic cracker running in an abnormal mode with no pre-established safe operating limits and no criteria for when to shut it down.

Source: U.S. Chemical Safety Board, ExxonMobil Torrance

In UProcess Every limit row names its operating mode from your company’s list. A row cannot be published without a value, the consequence of deviation and the steps to take.

V-201 · pressure · upper · by mode

Normal
17.5 bar g · Safe operating limit
Start-up
16.0 bar g · Safe operating limit
Shutdown
No row yet

A row publishes only with a value, the consequence of deviation and the steps.

02

The drawing on file is not the plant in the field.

A CCPS Beacon describes a fatal release where the P&ID left out a strainer, a check valve and isolation valves, so the PHA and its revalidation never saw the trapped-liquid hazard.

Source: CCPS Process Safety Beacon, July 2024

In UProcess Each register item points to the document in Document Manager and shows the revision in force, or that no revision is in force.

Register · Propane vaporizer area

P&ID of the unitP&ID-101 · rev C
In force
Relief system design basisRD-201 · no revision in force
No revision in force
03

The limits list grows, and stops being checked.

A refinery that set 645 safe operating limits across five units found some had no DCS pre-alarm configured, and planned a full reconciliation after two years of operation.

Source: CCPS Canadian regional meeting, NWR refinery

In UProcess Each row is checked as you write it: no time to consequence, no source scenario, no basis, or a limit sitting inside a lower class. The checks suggest; they never block.

Checks · V-201 · temperature · lower · start-up

No time to consequenceAsked on safe operating limits and critical integrity windows
No source scenarioLink a HAZOP deviation, or dismiss with a note
BasisDS-V201 · rev D

Checks suggest. They never stop you saving.

04

The plant changed. The information did not.

The CSB found a unit restarted on a new control system with an unapproved, overly complex procedure, incomplete operator training and the pre-startup review unfinished.

Source: U.S. Chemical Safety Board, Bayer CropScience

In UProcess When an MOC touches what a unit documents, the unit lists the items to update. Items still open 30 days after the change is installed read late, and a changed or retired limit publishes only with an approved MOC.

MOC-2026-0031 · this unit

18 Sep 2026
Change approved
2 Oct 2026
Installed
14 Oct 2026
Limits version 3 published with this MOC
1 Nov 2026
P&ID and OP-012 updates late

Late is read from the dates. Nobody types it.

Unit Propane vaporizer area

VersionPublishedByMOCAddedRewordedLimit changedRetired
13 Jun 2026Sarah Mitchell—14000
219 Aug 2026Sarah Mitchell—2300
314 Oct 2026David ChenMOC-2026-00310111

Reasons are kept per row. A changed or retired limit carries the MOC.

The record an auditor asks for.

What the operator read on a given day is a published version, not the latest edit.

  • Every required item, answered by a pointer or marked not applicable, with who and why.
  • Each limits version with its number, date, publisher and the MOC behind it.
  • Row by row, what changed between versions: added, reworded, limit changed or retired, and the reason.
  • The HAZOP studies that cover the unit, and the scenario each limit came from.

What’s in a unit register

Structure
Unit → register items from your company’s template → answers. One limits table per unit, kept as a draft and published as versions.
Answers
A document revision, a HAZOP study, a barrier element, a chemical record, the unit’s own limits, a reference in another system, or not applicable with a reason.
Limit row
Tag, parameter, direction, value and unit or a text limit, operating mode, class, consequence of deviation, steps, time to consequence, basis.
Classes
Ranked from safe operating limit down to normal operating range, as a company list. A check flags a higher class sitting inside a lower one for the same tag.
Changes
The MOC cases that touch the unit, each item resolved or dismissed with a reason, and late after a number of days your company sets.

Questions

Does UProcess keep a second copy of our P&IDs?

No. Document Manager holds the files and their revisions. The register points to the revision in force.

Can limits come from our HAZOP?

Yes. Deviations with a parameter, such as more pressure, propose rows through a preview. Nothing is created until you confirm.

What if the scenario behind a limit changes?

The row keeps a snapshot of its source and shows “Source changed”. You decide what to do with the new text.

Does every edit need an MOC?

No. Changing or retiring a published limit needs an approved MOC. An added or reworded row needs a written reason.

Your next PSI audit, answered by pointer.