Isolated, proven dead, and who holds it.One certificate, from the first point to the last lock off.

For isolating authorities and maintenance crews: points come from a register per equipment tag, each one isolated, verified and proven dead where its method asks, and every worker’s personal lock is on the record. With a permit, or on its own.

Held · 3 locks on. Every point proven. The certificate meets the isolation gate for every permit linked to it, and the crew’s locks are on the box.

ISO-2026-0031 · T-201 fill line
PTW-2026-0142 · Hot work on the T-201 roof · 12 Nov 2026
Held · 3 locks on
Authority · Lucas Almeida · isolating authorityBox · Group box GB-07Method · Positive (spade) on the fill line · company baseline met

Held · meets the gate on PTW-2026-0142

OrderPointEnergyMethodIsolatedVerifiedProof
1
P-201Transfer pump P-201 · MCC-4 bucket 7
ElectricalBreaker off, racked out, locked06:52 · Lucas Almeida06:54 · Lucas AlmeidaStart tried at local station: no start · 0 V at terminals, meter MT-12
2
XV-210Fill valve XV-210
Process · dieselClosed, locked, actuator air isolated06:58 · Lucas Almeida07:00 · Lucas AlmeidaPosition confirmed at the valve · no proof asked by method
3
F-3Spade at flange F-3
Process · dieselSpade downstream of XV-21007:01 · Lucas Almeida07:03 · Lucas AlmeidaBleed at F-3 open: no flow · 0.0 bar on PG-214

Locks · Group box GB-07

Lucas Almeida
Isolating authority · 06:50
Carlos Mendes
Arden Welding · 07:26
Rafael Okonkwo
Arden Welding · 07:27

Release waits for: PTW-2026-0142 handed back · 3 personal locks off

One certificate, three moments. Switch the state: steps fill in, locks go on and come off. An example certificate; the fields are the product’s, the values illustrative.

ISO-2026-0031 · T-201 fill line
Held · 3 locks onHeld · meets the gate on PTW-2026-0142
1 · P-201
Isolated · verified · 0 V
2 · XV-210
Isolated · verified
3 · F-3 spade
Isolated · verified · 0.0 bar

Where it connects

Energy IsolationConfined SpacesPermit to Work

On the same loop: Machine Safeguarding, Incident Investigation, Shift Handover and 38 more modules in one workspace.

Method note

Spade it, or prove the valves? It depends on what is behind them.

Positive isolation is the strongest. It is not always the safest one to install.

Leandro · Founder, UProcess

Guidance ranks isolations from physical disconnection, through double block and bleed, down to a single closed valve. Fitting a spade can mean breaking containment to make the plant safe for breaking containment, so experienced isolators argue over when a proved valve isolation is the better choice, and who may accept less.

So each point records its method, and a lower one carries its reason.

  • PositiveSpade, blind or disconnection, chosen from your method library.
  • ProvedValves closed and locked, and the isolation proven at the bleed before anyone breaks in.
  • Below the baselineAllowed with a written reason and the isolating authority’s signature.

Where Energy Isolation usually breaks

Four places an isolation goes wrong, and what the record does about each.

01

A closed valve is trusted, not proven.

At a refinery in Delaware, operators relied on one closed outlet valve to separate two vessels from a pressurised column. It leaked, hydrocarbon flowed back, and an operator was burned when a drain was opened. Nothing confirmed the isolation was holding first.

Source: U.S. Chemical Safety Board, Delaware City safety bulletin

In UProcess Each point is signed isolated, then verified, then proven dead where its method asks, with the instrument and the reading. The certificate is held only when every point is done.

Point 3 · spade at F-3

Isolated
07:01 · Lucas Almeida
Verified
07:03 · Lucas Almeida
Proven dead

Bleed at F-3 open: no flow · 0.0 bar on PG-214 · confirmed on device

02

The method drifts below the standard.

Guidance sets a baseline isolation for each hazard. A lower standard is acceptable only where a risk assessment supports it and an appropriate person authorises it, and repeated variations need a written justification and regular review.

Source: HSE, HSG253 The safe isolation of plant and equipment

In UProcess Each point carries its method from your library. A method below your baseline needs a written reason and the isolating authority’s signature.

ISO-2026-0034 · cooling water to E-305

Method
Single valve, locked
Baseline
Below the company baseline
Reason
Line at 2 bar, water at 30 °C; a spade needs a unit shutdown
Signed
Lucas Almeida · 11 Nov 2026 16:10
03

One lock for a whole crew.

Under group lockout, each authorised worker is expected to put their own lock on the group lockbox when they start and take it off when they finish, so nobody is covered by someone else’s lock.

Source: OSHA 1910.147(f)(3)

In UProcess The point keys go in a group box named on the certificate. Each worker’s personal lock is recorded on and off with their signature, and the certificate cannot move to release while any lock is on.

Group box GB-07 · ISO-2026-0031

Lucas AlmeidaIsolating authority · on 06:50
Lock on
Carlos MendesArden Welding · on 07:26
Lock on
Rafael OkonkwoArden Welding · on 07:27
Lock on

The box opens when the last lock is off.

04

The plant comes back while work is still open.

On Piper Alpha, the night shift most likely restarted a pump whose relief valve had been removed under a separate permit. Suspended permits were filed by trade, not by location, so checking them would not have shown the two together.

Source: IChemE Loss Prevention Bulletin 261

In UProcess A certificate is ready to release only when every permit relying on it is handed back and every personal lock is off. Reinstatement runs in reverse order, signed point by point.

Release and reinstatement · ISO-2026-0031

16:40
PTW-2026-0142 handed back
16:46
Last personal lock off · Lucas Almeida
16:58
Point 3 · spade removed, flange made up
17:04
Point 2 · XV-210 lock removed, valve returned to service
17:10
Point 1 · P-201 breaker restored · Released

Ready to release only when every linked permit is handed back and every lock is off.

A reactor on a process deck; a worker cuts the pipeline at its base with an abrasive wheel, sparks flying, next to a closed valve; another man stands nearby.
The moment before ignition

Process accident case · Inadequate isolation

The valves were closed. The reactor was not isolated.

No welding, no entry, so valves seemed enough. The cutting wheel was hot work.

· 2 killed · Trevor Kletz, What Went Wrong?

1Positive isolationValves were relied on because no welding and no entry were planned.Safe work practices
See the case →

Certificate ISO-2026-0031 · group box GB-07 · 12 Nov 2026

PersonCompanyOnOffSignature
Lucas AlmeidaSite06:5016:46Confirmed on device
Carlos MendesArden Welding07:2616:38Confirmed on device
Rafael OkonkwoArden Welding07:2716:39Not re-confirmed (sent offline)

Abandoned lock · ISO-2026-0029 · 9 Nov 2026

Lock owner
Daniel Price · left site 18:10
Looked for
Called twice; checked at the gate
Signed
Thiago Moreira, authoriser · Sarah Mitchell, appointed
Owner told
10 Nov 2026 06:45, before his shift

The record an auditor asks for.

An isolation is proven by the readings and the locks, not by a tick on a form.

  • Each point’s isolation and verification, signed, and its proof with instrument and reading.
  • Every personal lock on and off, by person and time.
  • Abandoned lock removals, with both signatures and the owner told.
  • Reinstatement in reverse order, signed point by point.

What’s in a certificate

Points
A register per equipment tag: energy, device, method and the steps to isolate, reused by every certificate instead of retyped for each job.
States
Draft → Being isolated → Held → Ready to release → Being reinstated → Released, or Cancelled before any point is isolated.
Proof
Isolated and verified, each signed with its time, and, where the method asks, proven dead with the instrument and the reading.
Group lockout
A named group box, a personal lock per worker on and off, and a separate abandoned lock procedure with two signatures.
Links
The permit’s isolation gate, the points a confined space needs, and a machine’s energy procedure, which starts a certificate already filled in.

Questions

Can a certificate exist without a permit?

Yes. A simple lockout for an operator task stands on its own. It is released when every personal lock is off.

What if a lock is found cut or a valve open?

Anyone can report the point as compromised. The certificate goes back to being isolated, and every permit linked to it is suspended until the point is isolated and verified again.

Can someone else remove my lock?

Only through the abandoned lock procedure: the owner looked for, the site checked, two signatures, and the owner told before their next shift. It is never a button on the lock.

Does it connect to electronic padlocks?

No. UProcess records the physical locks your people apply; it does not talk to lock hardware.

Your next isolation, proven before anyone breaks in.