Every space, its hazards and its rescue.One register entry per space, with the plan that gets people out.

For entry supervisors and site rescue leads: each confined space with its openings, hazards and isolation points, and an approved rescue plan drilled against its own response time. The entry itself is a permit in Permit to Work.

CS-01 · ready. What makes this space dangerous, how you get in, and what must be isolated before anyone does.

CS-01 · Reactor R-101
R-101 · Entry under permit · since 3 Mar 2025
CS-01 · ready
Site A · 6 spacesReady, drill current · 3Ready, drill overdue · 1No approved plan · 1Retired · 1
Volume
18 m³
Openings
Top manway 600 mm · side manway 450 mm
Access
Fixed ladder to the top platform
Contents
Resin slurry, washed out before entry
Hazards
Toxic residue · Oxygen deficiency · Agitator
Max entrants
2
Isolation
5 points · ISO-2026-0030 · 5 of 5 held

Entry runs as a permit in Permit to Work · PTW-2026-0150 · 1 inside of 2

One space, three views. Switch the view: the register, the plan and the drills come from the same record. An example space; the fields are the product’s, the values illustrative.

CS-01 · ready
CS-01 · Reactor R-101Ready · drill current
Hazards
Toxic residue · O₂ deficiency · agitator
Max entrants
2
Isolation
5 points · ISO-2026-0030 · 5 of 5 held
Rescue plan
RP-CS-01 v3 · 8 min
Last drill
12 Jun 2026 · 7 min · met

Where it connects

Energy IsolationConfined SpacesAction TrackingVerified

On the same loop: Permit to Work, Shift Handover and 39 more modules in one workspace.

Method note

Who goes in after them: your own team, or an outside service?

Both can work. Neither works on paper alone.

Leandro · Founder, UProcess

Some sites keep a trained rescue team on every shift. Others plan for retrieval from outside the space and call an outside service for the rest. Guidance accepts either, on two conditions: the rescue can reach the person in a time that suits the hazards of that space, and it has been practised.

So each space has its own plan, timed by its own drills.

  • Retrieval from outsideTripod and winch at the opening, so nobody else has to go in.
  • Site rescue teamA named team and its equipment, with the response time the plan commits to.
  • Outside serviceRecorded the same way, and drilled against the same clock.

Where Confined Spaces usually breaks

Four places confined space work goes wrong, and what the register does about each.

01

Nobody knew it was a confined space.

NIOSH calls recognising the space the first step in preventing deaths, and found that more than 60% of confined space fatalities were people trying to rescue someone else.

Source: NIOSH 86-110, Preventing occupational fatalities in confined spaces

In UProcess Every space is a register entry with its tags, openings, access, contents, hazards, maximum entrants and classification history. A space found on a walk-down goes in the same day, and shows ‘No approved plan’ until it has one.

Register · Site A

CS-01 · Reactor R-101Ready · drill 12 Jun 2026
CS-02 · Storage tank T-202Ready · drill overdue since Mar 2026
CS-05 · Manhole MH-7, storm drainAdded 2 Oct 2026 after a walk-down · No approved plan
CS-06 · Silo SL-2Retired · 11 Jan 2026

An entry permit for MH-7 cannot go active until its plan is approved.

02

The plan relies on help that cannot arrive.

At Cabin Creek, five painters died in a hydroelectric tunnel with a single exit. No qualified rescue crew was standing by, and the nearest technical rescue unit was over an hour away.

Source: U.S. Chemical Safety Board, Xcel Energy Cabin Creek

In UProcess Each space has a rescue plan with its method, response time, team and equipment, approved and signed as a version. An entry permit for the space cannot go active without an approved plan.

RP-CS-01 v3 · approved 2 Sep 2026

Method
Tripod and winch from the top manway
Response time
8 min
Team
Site rescue team · 4 on each shift
Approved by
Sarah Mitchell · signed

On the entry permit, the rescue gate reads: plan v3 approved · last drill 7 min against 8.

03

The rescue is written, never rehearsed.

OSHA’s confined space rule expects rescuers to practise a rescue before attempting a real one, and at least once every 12 months, in the space or one like it.

Source: OSHA 1926.1211

In UProcess Each drill records the time achieved against the plan’s response time, met or not, and its lessons. Lessons become actions in Action Tracking, and the entry permit shows the plan with its last drill.

Drills · CS-01

20 Nov 2025
11 min against 8 · not met · tripod kit in the workshop
24 Nov 2025
AT-0311 · store the kit at the R-101 platform · checked by David Chen
12 Jun 2026
7 min against 8 · met

Lessons go to Action Tracking and close after a check that they worked.

04

The space is not cut off from the plant.

HSE’s code of practice asks for a space to be securely isolated from anything that could flow in, by disconnection or blanks where possible, and for the isolation to be checked before entry. Ordinary shut-off valves give limited protection.

Source: HSE, L101 Safe work in confined spaces

In UProcess The space lists the isolation points it needs, taken from Energy Isolation. On the entry permit, the space shows how many of those points are held by linked certificates.

CS-01 · isolation points

Points needed
5 · feed, nitrogen, steam jacket, drain, agitator motor
Certificate
ISO-2026-0030
Held for this entry

5 of 5 points held by linked certificates

Space CS-01 · Reactor R-101 · rescue plan RP-CS-01

DatePlanScenarioAchievedTargetResultAction
12 Jun 2026v3Entrant collapsed at the agitator7 min8 minMet—
20 Nov 2025v2Entrant unresponsive below the side manway11 min8 minNot metAT-0311 · closed, checked
9 Jun 2025v2Entrant with a leg injury at the top manway6 min8 minMet—

The record an auditor asks for.

A rescue plan is proven by its drills, not by its approval date.

  • The register entry for each space, with its classification history.
  • The approved rescue plan version in force on the day of each entry.
  • Every drill: time achieved against the plan, met or not.
  • Drill lessons as actions, closed after a check that they worked.

What’s in a space

Register
Identification, tags, openings, access, contents, hazards, maximum entrants and classification, with every reclassification kept.
Isolation
The isolation points the space needs, from Energy Isolation, and how many are held for an entry.
Rescue plan
Method, response time, team and equipment, approved as a signed version. Earlier versions stay readable.
Drills
Date, time achieved against the plan, met or not, and lessons sent to Action Tracking.
Entry
Not here. Entry is a permit type in Permit to Work, which reads the space, its approved plan and who is inside now.

Questions

Where is the entry permit?

In Permit to Work. Confined Spaces holds the space and its rescue. The entry is a permit type your company sets up with its named roles and gas plan, and the space’s approved rescue plan is one of its gates.

Can a space have no rescue plan?

It can be in the register without one, and shows ‘No approved plan’. An entry permit for it cannot go active until a plan is approved.

How many people can be inside?

Each space sets its maximum. The entry permit shows it beside the count of who is inside now.

Who approves a rescue plan?

The approvers your company appoints per site. Each approval is a signature on that version of the plan.