A bowtie that stays true after the workshop.Built from your HAZOP, checked against it, proven where you track barriers.

For process safety engineers and operations leads: import scenarios from HAZOP & LOPA or start from a blank page, then publish versions the crew can read. The HAZOP is never changed by the diagram.

Full. The whole diagram, with each barrier’s state in words.

BT-0004 · Loss of containment from V-201
Draft · version 3 published 4 Nov 2026 · owner Sarah Mitchell
Full
Hazard · Propane under pressure in V-201
Threat lineBarriers
T1 · Steam valve TV-201 fails open, outlet blockedHAZOP-0007 · scenario 2.1
PAHH-201, operator isolates steamAlarm and response · Not assessed · BE-0014 · R1 verification 71 days overdue
PSV-201 relief to flareRelief device · In place · BE-0012 · verified 3 Oct 2026 · next due 3 Oct 2027
T2 · Cold start-up below minimum design metal temperatureAdded in this bowtie
Start-up warming procedureProcedure · In place
T3 · Liquid overfill into the vapour headerHAZOP-0007 · scenario 2.4
ESD valve XV-201 closesShutdown · Impaired · Stroke time 18 s at last test, target 12 s
Top event · Loss of containment from V-201
ConsequenceBarriers
C1 · Jet fire at the vessel
Deluge DV-201Fire protection · Not in place · BE-0016 · R2 failed on 21 Oct 2026, not restored
C2 · Vapour cloud drifts toward the control room

One bowtie, three views. An example diagram; the fields are the product’s, the values illustrative.

T1 · Steam valve TV-201 fails open, outlet blocked
Loss of containment from V-201
Barrier 1
PAHH-201, operator isolates steam · Not assessed
Barrier 2
PSV-201 relief to flare · In place
Top event
Loss of containment from V-201
Consequences
Jet fire at the vessel · Vapour cloud toward the control room
Version 3 · 4 Nov 2026

Where it connects

HAZOP & LOPABowtie AnalysisAction TrackingVerified

On the same loop: Barrier Management, Permit to Work, Emergency Preparedness & Response and 38 more modules in one workspace.

Method note

Declared state, or proven state? Both schools are right.

A workshop knows things no test record holds. A test record knows things no workshop remembers.

Leandro · Founder, UProcess

One school has the team declare each barrier’s condition, because the people who run the plant know which alarm everyone ignores. The other will show only what records prove, because a declared state is an opinion that ages the day it is written.

So each barrier can carry the team’s word, or the plant’s proof.

  • DeclaredThe team sets In place, Impaired, Not in place, Out of service or Not assessed. Impaired, Not in place and Out of service need a note.
  • ProvenLinked to a Barrier Management element, the box shows the status its proof records produce, with the reason.

Where Bowtie Analysis usually breaks

Four places a good bowtie goes wrong, and what the diagram does about each.

01

Training is drawn as a barrier.

Quality reviews of asset bowties keep finding degradation controls, such as training and procedures, drawn on the line as if they were barriers.

Source: Boult, Rowe and McCulloch, IChemE Hazards 30

In UProcess A barrier named like a management-system activity raises a check, with the offer to move it under a degradation factor as a control.

Check 2 · T2

Start-up warming procedure

Reads like a management-system activity. Procedures belong under a degradation factor.

Move to degradation control

Factor: “Without start-up warming procedure” · control: Start-up warming procedure

02

A valve is drawn alone.

The authors of the CCPS–EI bowtie guidance list lone equipment, a fire pump or an ESD valve, drawn as a barrier with no detect, decide and act behind it.

Source: Johnson, Manton, Cowley and Scanlon, IChemE Hazards 28

In UProcess Active barriers record detect, decide and act. A missing part, a threat line resting on one barrier, or a line with none each raises a check you can dismiss with a note.

ESD valve XV-201 closes · Shutdown

Detects
Not recorded
Decides
Not recorded
Acts
XV-201 closes

Check 3: an active barrier must detect, decide and act.

03

The diagram says in place. Nobody checked.

In HAZOP and LOPA a barrier is assumed to work as intended. The CCPS–EI method adds what those studies lack: tracking the barrier’s condition.

Source: Manton et al., IChemE Hazards 27

In UProcess Each barrier carries a declared state, with a note when it is less than in place. Linked to a Barrier Management element, the box shows the status its proof records produce.

T1 · barriers

PSV-201 relief to flareBE-0012 · verified 3 Oct 2026 · next due 3 Oct 2027
In place
PAHH-201, operator isolates steamBE-0014 · R1 verification 71 days overdue
Not assessed
04

The HAZOP moves on. The bowtie does not.

Auditors using bowties note that the basis of safety changes over time, and that weaknesses often come from ageing equipment and poor management of change.

Source: Anderson et al., IChemE Hazards 26

In UProcess Imported elements keep a snapshot of their HAZOP source. When it changes, the element shows “Source changed” with both values, and you take the new text, keep yours, or detach it.

Source changed · T3

In the bowtie
Liquid overfill into the vapour header
In HAZOP-0007 now
Level control LV-202 fails, liquid overfill into the vapour header
Changed
Text

Take the changeKeep this bow-tie’s textKeep without source

Credit and PFD always follow the HAZOP. Only text can be kept.

Bowtie BT-0004

VersionPublishedByNoteAddedEditedRemovedStates changed
122 Oct 2026Sarah MitchellImported from HAZOP-0007, nodes 2 and 314000
229 Oct 2026Sarah MitchellMitigation side after the fire review3211
34 Nov 2026David ChenXV-201 impaired after stroke test0102

The record an auditor asks for.

A bowtie is evidence when you can show which version the crew was briefed on.

  • Published versions, read-only, each with who published it, when and a note.
  • A history of every change, by person and day.
  • Each imported element’s HAZOP source, what changed and what was decided.
  • Every dismissed check, with the note that dismissed it.

What’s in a bowtie

Structure
One hazard and one top event; threat and consequence lines; barriers in order on each line; degradation factors and their controls.
Barriers
Type from your company list, detect, decide and act, owner, critical flag, declared state with a note.
Sources
Threats from HAZOP causes, consequences from HAZOP consequences, barriers from the scenario’s safeguards, each kept as a snapshot.
Checks
Eight quality checks, from a line with no barrier to a top event that reads like a consequence. They suggest; they never block.
Versions
One draft you edit, and published versions that never change.

Questions

Do I need a HAZOP to draw a bowtie?

No. Start from a blank page, or import scenarios from HAZOP & LOPA and edit the copy.

Does editing the bowtie change our HAZOP?

No. The bowtie keeps a copy and a link. Changes flow one way, and only when you take them.

Does the bowtie calculate risk?

No. Frequencies and PFDs belong to LOPA. The bowtie shows the HAZOP’s credit as a snapshot.

Can a barrier start an action?

Yes. A barrier, a degradation factor or a line can start an action in Action Tracking, and shows its open actions.

Your next bowtie, still true next year.